ARH 208 Equipment Selection and Duct Design

Students are exposed to techniques and procedures used in the residential construction industry. Proper sizing of HVAC equipment and ducts to meet the requirements necessary to install a typical residential heating and cooling system is examined. Students also determine proper heat load and cooling load calculations using typical manual J methods. 12 (3 lecture hours and 2 laboratory hours) Note: In addition to tuition, this course requires an additional variable tuition rate.

Credits

4